The Eaton Industrial Building
Ann Arbor, Michigan

TDS was contracted by a Chicago based development company to field verify and provide existing CAD drawings on this approx. 180,000 sq. ft. mixed use industrial / office facility (active tenant was a branch of Eaton Inc.).

Scope of work included five (5) full floor plans, roof plans w/ equipment and slopes, reflected ceiling plans at all floors, four (4) detailed exterior elevations, building sections, nine (9) wall sections and underground tunnel verification / video documentation.

Initial lead time of seven (7) days with a primary turn-around of fifteen (15) business days.